Pile Jacket Installation for Battery Park City Authority
Battery Park, NY
In 2014 Hydro-Marine Construction Co., Inc. assisted in the installation of pile repair jackets on over 100 piles. Existing 20” square concrete piles were encased in fiberglass protective jackets. Epoxy fill material was pumped between the pile and jacket. Water depths in the work area ranged from 18 to 45 feet deep. All OSHA and ADC standards were followed to ensure the safety of the dive personnel.
All materials and the installation procedures were provided and utilized by Hydro personnel. Constructability is key for any project and it will govern how the project will proceed.