Scour Protection Installation

Bridge Scour Protection at Sicklerville Rd (CR 536) Bridge over Great Egg Harbor River

Camden, NJ

In 2016 Hydro-Marine Construction Co., Inc. performed the scour protection repairs for the Sicklerville Road Bridge located in Winslow Township, NJ. The bridge is a single span bridge measuring approximately 50’x50 out to out. Stone riprap protection was installed in front of both abutments and extended in front of the wingwalls on either side of the bridge to the shoreline. Geotextile material and approximately 157 S.Y. …Continue reading »

Posted in News, Projects |

Bridge Pier Repairs and Jackets

Concrete Pier Repairs for Bridge S-31 (Oceanic Bridge) Bingham Avenue Over Navesink River

Middletown Township & Rumson Borough Monmouth County, New Jersey

Hydro-Marine Construction was awarded the contract for the installation of approximately 56 fiberglass pile jackets at Bridge S31 in 2016. The existing piles range in size and shape, mainly consisting of 20” to 22” reinforced concrete piles. The existing wrought iron collars and pile jackets need to be removed and the piles cleaned prior to installation of the new pile …Continue reading »

Posted in News, Projects |

DRWC Dredging Operations

Dredging Operations for 3 Marinas for Delaware River Waterfront Corporation

Piers 3, 5, & 9 Marinas, Philadelphia, PA

Hydro-Marine Construction Co., Inc. completed the dredging operations for the three locations on the Delaware River. The scope
of work was to dredge the areas to a bottom elevation of -5.0. An Ellicott Series 360 SL, Swing Ladder Dredge and DredgePack software were used for the dredging operations.

Pre and post dredge surveys were completed to ensure proper channel bottom elevations and to calculate the …Continue reading »

Posted in Projects |

Pier 68S Rehabilitation Design/Build

Pier 68S Rehabilitation Design/Build

Pier 68 South, Philadelphia, Pennsylvania

In 2015 The Castle Group provided the design/build services for the structural rehabilitation of Pier 68S. Pier 68 South is a timber low deck finger pier built in the 1930’s, located along the Delaware River in Philadelphia, Pennsylvania. In its original as-built condition, the pier extended into the river approximately 500 feet from the marginal bulkhead on the upriver side and approximately 470 feet from the marginal bulkhead on the downriver side. A …Continue reading »

Posted in Projects |

Bridge Pier Repairs and Jackets

Concrete Pier Repairs for Bridge S-31 (Oceanic Bridge) Bingham Avenue Over Navesink River

Middletown Township & Rumson Borough, Monmouth County, New Jersey

Hydro-Marine Construction was awarded the contract for the installation of approximately 56 fiberglass pile jackets at Bridge S31 in 2016. The existing piles range in size and shape, mainly consisting of 20” to 22” reinforced concrete piles. The existing wrought iron collars and pile jackets need to be removed and the piles cleaned prior to installation of the new pile …Continue reading »

Posted in Projects |

Pile Jacket Installation at County Bridge

Pile Jacket Installation at Canton-Greenwich Road Bridge Over Stow Creek

Cumberland County, NJ

In 2013, as part of the rehabilitation of the bridge, Hydro-Marine Construction Co., Inc. completed the installation of 70 pile jackets. Forty-Two  of the pile jackets were structural and twenty-eight  were protective jackets, each measuring 10 foot long. The extent of deterioration on the existing timber piles determined the type of jacket required. Both types of jacket were manufactured by Denso. The structural jacket consisted of a SeaShield Series 400 …Continue reading »

Posted in Projects |

Emergency Repairs at Ohio Avenue Bridges

Emergency Repairs At Ohio Bridges Structure Nos. 01AT-L01 & 01AT-L02

Atlantic County, NJ

In 2014, Hydro-Marine Construction Co., Inc. completed the repair of two bridges on Ohio Avenue which included repairs to the timber piles. Both bridges are constructed of timber pile pier bents with timber piles and retaining wall at the abutments. The bridges were immediately closed after W.J. Castle performed the routine underwater inspection of the bridges and found that several of the timber piles and bracing exhibited advanced decay and …Continue reading »

Posted in Projects |

Outfall Anchor Replacement & Repair

Outfall Anchor Replacement and Repair Long Branch Sewage Authority

Long Branch, NJ

In 2015 Hydro-Marine Construction Co., Inc. completed the underwater inspection and repair of the Long Branch Sewerage Authority Ocean Outfall Pipe in the Atlantic Ocean.

With the recent storms like Hurricane Sandy, the structure owners were concerned about preventing movement in the outfall pipe due to future storms. The project included determining the dimensions at various points along the pipe, clearing any clogged outfall diffusers, locating/salvaging all existing tie-downs, and driving 20 new …Continue reading »

Posted in Projects |

Pile Jacket Installation at JFK Bridge

Pile Jacket Installation at JFK Bridge (EH-48) Over Risley Channel

Atlantic County, NJ

In 2014, Hydro-Marine Construction Co., Inc. working as a subcontractor, completed the installation of 115 pile jackets at the bridge. The first eight piers are constructed of timber pile bents and the remaining piers are constructed of steel pipe piles.

There were three types of jackets installed on the timber piles based upon level of deterioration. Approximately forty-nine (49) Denso SeaShield Series 90 protective jackets were installed and sixty-three (63) Denso SeaShield …Continue reading »

Posted in Projects |

Pile Jacket Installation at Battery Park, NY

Pile Jacket Installation for Battery Park City Authority

Battery Park, NY

In 2014 Hydro-Marine Construction Co., Inc. assisted in the installation of pile repair jackets on over 100 piles. Existing 20” square concrete piles were encased in fiberglass protective jackets. Epoxy fill material was pumped between the pile and jacket. Water depths in the work area ranged from 18 to 45 feet deep. All OSHA and ADC standards were followed to ensure the safety of the dive personnel.

All materials and the installation procedures were …Continue reading »